Search Downloads
Category: Restricted
Page 1 of 2
Order by: Default | Name | Date | Hits | [Descending]
Files:
D3.4: Dependability Assessment Tools and Report

This report presents the foreseen processes, procedures and tools applicable for dependability assessment that can be adopted in safety-critical software V&V and used across domains as well as to be applied for projects following several different industry standards and requiring strict certification.
This report builds upon some of the proposals for development identified in D3.1 and details the needs, the applicable processes and existing tools that can support the task of dependability assessment.
This report contains the idea of development/ improvement of those dependability assessment tools or processes.

Date 2016-02-29 Filesize 2.41 MB Download 4 {link_to_details}
D3.5: Dependability Assessment Practical Report

The aim of this document is to present and discuss the results of the application of the processes and tools identified in D3.4 to a set of selected case studies, identifying limitations and weaknesses and also providing elements for future improvements.

Date 2016-02-29 Filesize 431.54 KB Download 2 {link_to_details}
D3.3: Robustness Evaluation Practical Report

The aim of this document is to present and discuss the results of the application of the processes and tools identified in D3.2 to a set of selected case studies, identifying limitations and weaknesses and also providing elements for future improvements.

Date 2016-02-29 Filesize 2.64 MB Download 7 {link_to_details}
D3.2: Robustness Evaluation Tools and Report

This report presents the foreseen processes, procedures and tools applicable for robustness evaluation that can be adopted in safety-critical software V&V and used across domains as well as to be applied for projects following several different industry standards and requiring strict certification.
This report builds upon some of the proposals for development identified in D3.1 and details the needs, the applicable processes and existing tools that can support the task of robustness evaluation.
This report also presents the idea of further development and integration of existing robustness evaluation tools in order to build a solution suitable for the safety-critical software V&V processes.

Date 2016-02-29 Filesize 1.9 MB Download 2 {link_to_details}
D4.3.2: Periodic Dissemination and Exploitation Plan

This document aims to report about the second year dissemination of CECRIS project.

Date 2015-03-11 Filesize 644.26 KB Download 4 {link_to_details}
D3.1: Extendable V&V Framework

This report presents the state-of-the-art study concerning safety-critical V&V tools used across domains and applied for projects following several different industry standards.

Date 2015-03-11 Filesize 1.18 MB Download 3 {link_to_details}
D2.3: Integration of Safety and Security Aspects Into Existing Methodologies

This deliverable aims at describing how the aspects of safety and security can be integrated when designing, developing or certifying critical embedded systems (ES).

Date 2015-03-11 Filesize 2.43 MB Download 3 {link_to_details}
D0.4.4: First Periodic Report

This report is a scientific and management report of the activities carried on in the CECRIS project during the period M1-M24.

Date 2015-03-11 Filesize 2.2 MB Download 1 {link_to_details}
D0.4.3: Mid Term Review Report

This report is a scientific and management report of the activities carried on in the CECRIS project during the period M1-M18.

Date 2015-03-11 Filesize 1.49 MB Download 1 {link_to_details}
D2.2: Evaluation Of Existing Techniques And Company Specifics Techniques For Robustness And Dependability

Evaluation of safety and robustness. Safety and robustness are core attributes of critical systems ....

Date 2014-07-31 Filesize 0 B Download 6 {link_to_details}
D4.3.1 - Periodic Dissemination and Exploitation Plan

This document aims to report about the first year dissemination of CECRIS project....

Date 2014-03-19 Filesize 0 B Download 16 {link_to_details}
D4.2 Roadmap for future collaborations and R&D

The aim of this deliverable is to describe the basis for the creation of a long-term ...

Date 2014-03-19 Filesize 424.15 KB Download 12 {link_to_details}
D2.1 - Assessment Methodology for and Analysis of Companies V&V Processes

As first step, this report aims at the elaboration of a general purpose analysis methodology...

Date 2014-03-19 Filesize 2.18 MB Download 13 {link_to_details}
D1.3 Analysis And Assessment Of Verification Techniques
Date 2014-03-19 Filesize 1.18 MB Download 11 {link_to_details}
D1.2 Analysis of the Interaction Between Safety and Security Concerning Certified Systems
Date 2014-03-19 Filesize 2.07 MB Download 17 {link_to_details}
Joomla templates by a4joomla

Please be aware that this website uses cookies.